Some Recent Projects

 

Fort Lee BRAC (2006)
Environmental Impact Statement and Conformity Determination
Base realignment of Fort Lee. Including the proposed construction of 6 million square feet of new facilities.

 
  Sparrows Point LNG and Cogeneration Facility (2006)
Resource Report #9 Noise Impact Assessment
Site planning for a proposed liquid natural gas and cogeneration facility on the coast of Maryland.

 
  HM-15 Squadron Relocation (2006)
Environmental Impact Statement and Conformity Determination
The relocation of a squadron of Sea Dragon Naval helicopters and associated support facilities and personnel.

 
  Naval Weapons Station Yorktown Rifle Range (2006)
Environmental Assessment
The proposed establishment of a new small arms training range

 
  Unaccompanied Personnel Housing (2007) Fort Stewart and Fort Bragg
Environmental Assessments
The proposed development of over 1000 single bed apartments for unaccompanied personnel.

 
  FERC NE-07 Pipeline Expansion (2006)
Environmental Impact Statement and Conformity Determination
The expansion of many and varying components of the natural gas network throughout the Northeast.

 
  PMZ Runway Expansion (2006)
Noise Analysis and Assessment
The proposed expansion of the main runway at Plymouth County Municipal Airport.

 
  Fort Belvoir BRAC (2007)
Environmental Impact Statement Conformity Determination
Base realignment of Fort Belvoir. Including the proposed construction of 7 million square feet of new facilities.

 
  Camp Bowie Multipurpose Machine Gun Range (2005)
Environmental Assessment
Proposed MRF and MPMG Ranges for ANG training.

 
  Buckley AFB Annex (2005)
Environmental Assessment and Conformity Determination
Modifications to prepare the Buckley for upcoming BRAC efforts.

 
  Runnels Federal Building (2005)
Supplemental EA
Changes to proposed federal courthouse in Austin, TX

 
  National Army Museum (2005)
Environmental Assessment and Conformity Determination
The establishment and construction of the National Army Museum.

 
  ROTHR Radar Timber Harvest (2005)
Environmental Assessment and Conformity Determination
Timber harvest activities associated with ROTHR Radar clear zone management.

 
  Pier D Replacement (2005)
Environmental Assessment and Conformity Determination
The replacement of pier D at the Norfolk Naval Shipyard.

 
  Indian Creek Correctional Institution (2005)
ACA Accreditation Survey Sound survey to ensure ACA reaccredidation compliance

 
  Hague Building (2005)
Noise Suitability Study Mechanical room criteria noise measurements and suitability evaluation.

 
  DCEETA Remote Delivery Facility (2005)
Environmental Assessment and Conformity Determination
The construction and operation of the DCETTA Remote Delivery Facility and New Gate.

 
  Beulah Street Realignment (2005)
Environmental Assessment and Conformity Determination
Security Improvement and a realignment of a key cross base roadway.

 
  SDDC HQ Realignment (2004)
Environmental Assessment
The realignment of SDDC personnel and the construction of a 200,000sf facility.

 
  Rehabilitation of the Chamberlin Hotel (2004)
Environmental Assessment
Modifications to prepare the Chamberlin Hotel for military retirement housing.

 
  DEA and Federal Courthouse (2004)
Environmental Assessment
Proposed DEA and courthouse annex with adjacent hospital and nursing home.

 
  Austin Federal Courthouse (2004)
Environmental Assessment
Proposed federal courthouse annex.

 
  Del Rio Point of Entry (2004)
EIS
Security upgrades to POE resulting in road closure.

 
  Special Purpose Facility (2004)
Environmental Assessment
Construction of a special purpose facility.

 
  Security Gate Closures (2004)
Environmental Assessment
Post 9/11 closure of 19 points of access to FSH.

 
  5th Army Headquarters
Environmental Assessment
Relocation of the 5 th Army HQ to Fort Sam.

 
  Consolidated Fuels
Environmental Assessment
Proposed consolidated tank farm and associated buildings.

 
  Fire Training facility
Environmental Assessment
Design and fabrication of a propane fire training facility.

 
  Entomology Building
Environmental Assessment
Demolition and relocation of BAFB entomology services.

 
  Relocation SDDC Headquarters
Environmental Assessment
General and transportation conformity. Air-quality modeling

 
  War Road Expansion White Sands Missile Range
Environmental Assessment
General and transportation conformity. Traffic air-quality modeling. NEPA Support.

 
  Police Academy Firing Range
Noise Survey
Environmental Noise Assessment and Architectural Review

 
  Expansion of Westmoreland Road
Categorical Exclusion
Traffic noise modeling and assessment

 
  Refugio Street Apartments
HUD Noise Assessment
Environmental Noise Assessment and Architectural Review

 


"Quality Information for Architects, Engineers and Planners"
Air Quality | Acoustics and Noise | Transportation and Traffic | Contact Us | ©2008 LPES, Inc.